The Public Works Authority, Ashghal, has announced the extension of the temporary closure on the intersection of Rawdat Rashed Road and Salwa Road (Exit 29) to the end of January, 2017. The closure is to complete the implementation of Phase 4 of Rawdat Rashed Road Development Project.
The closure includes part of the exit from Rawdat Rashed Road to Salwa Road. Traffic can use a parallel alternative road during the closure.
In addition, entrance from Salwa Road to Roundabout (2) will still be closed to heavy vehicles. Heavy vehicles can drive towards Roundabout (1) then take a U-turn to the main road.
The road from Roundabout (2) towards Roundabout (3) southbound will remain closed.
Drivers coming from Bu Samra have to drive towards Exit 24, then go back to Salwa Road and enter Rawdat Rashed Road.